Skip to main content

ConstructionNotices

Go Search
SharePoint
Sites
Search
  
SharePoint > Sites > The Facilities at San Mateo County Community College District > ConstructionNotices > Construction Notice  

Construction Notice  (Click here to return to Facilities Page)

Modify settings and columns
This list contains construction notices for CIP2
  
View: 
Sort by AttachmentsUse SHIFT+ENTER to open the menu (new window).
Project Name
Notice Category
Location
Project DescriptionFilterCampus ImpactFilter
Count = 190
Repairs in Hillsdale Parking LotsUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoTraffic11/16/201112/16/2011Lot 1 Upper - Hillsdale Lot 1 Upper; Lot 1 - Hillsdale Lot 1Wednesday, November 16, 2011  8 AM to 4 PM
Improvements to road surfaces, pedestrian paths and stairs, lighting, drainage.

Hillsdale Lots 1D/ 1E/ 1F Spot Repairs 

 

Contractors will be performing some local pavement repairs in the lower Hillsdale Parking lot. There will be small deliveries of rock material and asphalt paving during this period. There will be noise from construction equipment.

Christine Tai,  Construction Project Manager650 378-7350mailto:taic@smccd.edu11/9/201111/15/2011 3:08 PM
Left Lane of North Hillsdale Blvd ClosedUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoTraffic10/12/201111/4/2011CSM - Entire CampusWednesday October 12, 2011- November 4, 2011
CSM Main Gas Line Improvements
A new gas line will be installed for the CSM campus. The far left lane of northbound Hillsdale Blvd. (uphill direction) will be closed from Clearview Dr. to the main campus entry. Traffic will not be stopped, but may be slowed as there will be two lanes of moving traffic instead of the usual three from Clearview Dr. to the campus entry. All lanes will be reopened by November 4, 2011.
Roger Anchartechahar650-358-6844mailto:anchartechaharr@smccd.edu10/5/201110/11/2011 10:59 AM
Truck Traffice on Loop RoadUse SHIFT+ENTER to open the menu (new window).
Buildings 12/15/17/34 ModernizationCollege of San MateoTraffic10/24/201110/28/2011Building 34 - BookstoreMonday, October 24 through Friday, October 28, 2011  7:00 AM – 4:30 PM
CSM B34 Modernization: Interior and exterior improvements to provide spaces for Information Technology Services (ITS), Shipping/Receiving, and CSM Fire Academy.
B34 Exterior concrete pour near CSM Fire Academy driveway on Thursday, October 27 There may be some traffic congestion due to concrete trucks in the vicinity of Building 34 on the morning of the pour. You may also notice noise from equipment and a jackhammer earlier in the week.
Christine Tai,  Construction Project Manager650 738- 7055, 650 378-7337 mailto:taic@smccd.edu10/17/201110/21/2011 12:42 PM
Abatement Work in Building 25Use SHIFT+ENTER to open the menu (new window).
North GatewayCollege of San MateoInformation Only9/6/201110/14/2011Building 25 - Machine ToolSeptember 6, 2011 to October 14, 2011

Abatement of Building 25 in preparation for the demolition of the building as part of the upcoming CSM North Gateway Part II Project.

Minimal campus impact is expected due to the abatement work:

  1. Contractors work will be limited to the interior of Building 25
  2. Contractors laydown area will be within the fenced area NW of Building 25
  3. Walkway between Building 26 and 27 will remain open

The Contractor will provide caution tape, signage etc. to ensure public safety.

No impacts are expected to vehicular traffic along perimeter roads or to pedestrian traffic on campus.

As always, please proceed with caution near construction zones.

Sajid Sulaiman650 378-7332mailto:sulaimans@smccd.edu8/30/20119/6/2011 8:21 AM
Limited Access to Building 36 West StairsUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoPedestrian Access8/8/201110/8/2011Building 36 - Science/PlanetariumAugust 8, 2011 through October 8, 2011
Repair water leak in West Stair

Plaster replacement at the West Stair, located closest to Marie Curie Lot 5

Scaffolding will be set up outside the West stair tower in order to replaster the north and west faces of the tower.

 

The stair door and the West corridor door will be designated for ‘Exit Only’ from 7 am to 4 pm on Mondays through Fridays. Please use alternate building entrances during these hours.

Christine Tai,  Construction Project Manager650 378-7350mailto:taic@smccd.edu8/1/20118/8/2011 9:13 AM
Traffic and Pedestrian Disruption near Building 18Use SHIFT+ENTER to open the menu (new window).
North GatewayCollege of San MateoPedestrian Access; Traffic12/1/20109/30/2011Building 18 - Instructional FacilityTree Maintenance: December 2010 through January 2011; Load Center 8 and Site Wall: December, 2010 through September, 2011
Decommissioning of Existing Load Center 4 (adjacent to Building 36) and Construction of New Load Center 8 adjacent to Building 18. Construction of a Site Wall at North East Perimeter Road. Tree trimming or removal for safety, tree health, fire prevention and maintenance.

Two rows of parking in the Marie Curie Parking Lot 5 A, adjacent to Building 18, will be fenced off and used as Contractor’s construction and staging area. The exterior stairs leading down from the West side of Building 18 to Lot 5 A will be closed. All other portions of the Marie Curie Parking Lot A and B, including accessible reserved parking stalls across from the Planetarium, will remain open.

 

A section of the sidewalk along North East Perimeter Road will be fenced off for Site Wall construction. The exterior stairs to the South side of B36 adjacent to the pedestrian bridge into the second floor of B36 will be closed. Various sections of sidewalk along the Perimeter Road will be closed during tree maintenance activities. Vehicular access along the Perimeter road will not be impacted.

 

The Contractor will provide signage, flag persons, etc. to mitigate impact and ensure vehicular/pedestrian access and safety.

 

As always, please proceed with caution near construction zones.
Sajid Sulaiman,  Construction Project Manager650 378-7332mailto:sulaimans@smccd.edu11/24/201012/20/2010 11:05 AM
East Half of Steps in Pool Area ClosedUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoPedestrian Access9/14/20119/16/2011Building 8 - GymnasiumWednesday, September 14, 2011 through Friday, September 16, 2011
Modernization of landscape, roadways and public open space.
Concrete repairs at east end of steps of aquatics bench seating The east half of the steps in the pool area will be cordoned off for safety for the entire duration. On Wednesday, there will be some noise from power tools used to remove cracked pieces of concrete.
Christine Tai,  Construction Project Manager650- 378-7350mailto:taic@smccd.edu9/7/20119/19/2011 3:20 PM
Construction Activities on 1st Floor of Building 10Use SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoInformation Only9/10/20119/10/2011Buidling 10 - College CenterSaturday, September 10, 2011  6:00 AM to 6:00 PM
First Floor: Re-sizing Monitor locations (2) for horizontal installation
First Floor: Re-sizing Monitor locations (2) for horizontal installation
Mario Galeano,  Construction Manager650- 378-7337mailto:galeanom@smccd.edu9/3/20119/9/2011 1:09 PM
Bulldog Lot 5A ClosedUse SHIFT+ENTER to open the menu (new window).
Buildings 12/15/17/34 ModernizationCollege of San MateoParking8/13/20118/14/2011Lot 9 - Bulldog Lot 9Saturday, August 13, 2011 and Sunday, August 14, 2011  8:00 AM – 4:30 PM

CSM B34 Modernization:  Interior and exterior improvements to provide spaces for Information Technology Services (ITS), Shipping/Receiving, and CSM Fire Academy.

Exterior painting of Building 34 roof

 

The roof will be painted over the weekend. Bulldog Lot 9A, located to the south of Building 34, will be closed in order to prevent damage from wind-borne paint overspray.

Christine Tai,  Construction Project Manager650- 378-7350mailto:taic@smccd.edu8/6/20118/10/2011 4:21 PM
Building 34 ClosedUse SHIFT+ENTER to open the menu (new window).
Buildings 12/15/17/34 ModernizationCollege of San MateoPedestrian Access3/21/20118/8/2011Building 34 - BookstoreMarch 21, 2011 through August 8, 2011

B34 Modernization:  Building 34 will receive interior and exterior improvements to provide spaces for Information Technology Services (ITS), Shipping/Receiving, and CSM Fire Academy.

CSM BUILDING 34- UNDER CONSTRUCTION

 

Construction fencing will enclose the building and its adjacent grounds, including parking spaces, beginning on Monday, March 21.

 

The CSM Bookstore will operate from its new location on the mall side of Building 10 beginning on March 21, 2011.

Christine Tai,  Construction Project Manager650- 378-7350mailto:taic@smccd.edu3/14/20113/17/2011 3:10 PM
Building 34 Exterior PaintingUse SHIFT+ENTER to open the menu (new window).
Buildings 12/15/17/34 ModernizationCollege of San MateoInformation Only7/29/20117/31/2011Building 34 - BookstoreJuly 29, 2011 through July 31, 2011

CSM B34 Modernization:  Interior and exterior improvements to provide spaces for Information Technology Services (ITS), Shipping/Receiving, and CSM Fire Academy.

Exterior paint

 

The exterior surfaces of Building 34 will be prepped and painted from Friday, July 29 through Sunday, July 31.

Christine Tai,  Construction Project Manager650- 378-7350mailto:taic@smccd.edu7/22/20117/29/2011 7:22 AM
Trucks Near Hillsdale LotsUse SHIFT+ENTER to open the menu (new window).
Buildings 12/15/17/34 ModernizationCollege of San MateoTraffic7/30/20117/30/2011Lot 1 - Hillsdale Lot 1; Lot 1 Upper - Hillsdale Lot 1 UpperSaturday, July 30, 2011  9 AM to 5 PM
Improvements to road surfaces, pedestrian paths and stairs, lighting, drainage.

Hillsdale Lots 1D/ 1E/ 1F Resurfacing 

 

The western portion of these lots will receive a cape seal coating on Saturday. There will be deliveries of rock material and asphalt emulsion during this period. There will be noise from construction equipment during the resurfacing activities.

Christine Tai,  Construction Project Manager650 378-7350mailto:taic@smccd.edu7/23/20117/29/2011 7:27 AM
Abatement of Buildings 26 and 28 in preparation for the demolition of these buildings.Use SHIFT+ENTER to open the menu (new window).
North GatewayCollege of San MateoInformation Only7/25/20117/29/2011Building 26 - Technology; Building 28 - Test CellBuilding 28: July 25, 2011 – July 26, 2011; Building 26: July 27, 2011 – July 29, 2011

Abatement of Buildings 26 and 28 in preparation for the demolition of these buildings.

Minimal campus impact is expected due to the abatement work:

·         Restrooms in Building 26 will not be available.

·         Walkway between Building 26 and 27 will be functional.

 

The Contractor will provide fencing, caution tape, signage etc. to ensure public safety.

 

No impacts are expected to vehicular traffic along perimeter roads or to pedestrian traffic on campus.

 

As always, please proceed with caution near construction zones.
Sajid Sulaiman650 378-7332mailto:sulaimans@smccd.edu7/18/20117/26/2011 8:10 AM
Painting at Building 34Use SHIFT+ENTER to open the menu (new window).
Buildings 12/15/17/34 ModernizationCollege of San MateoInformation Only7/22/20117/24/2011Building 34 - BookstoreJuly 22, 2011 through July 24, 2011

CSM B34 Modernization:  Interior and exterior improvements to provide spaces for Information Technology Services (ITS), Shipping/Receiving, and CSM Fire Academy.

 

Click Here for Rendering of Painted Building (Adobe PDF)

Exterior paint

 

The exterior surfaces of Building 34 will be prepped and painted from Friday, July 22 through Sunday, July 24.

Christine Tai,  Construction Project Manager650- 378-7350mailto:taic@smccd.edu7/15/20117/22/2011 9:14 AM
Walkways Between Buildings 26 & 27 and Building 26 Restroom ClosedUse SHIFT+ENTER to open the menu (new window).
North GatewayCollege of San MateoInformation Only7/21/20117/22/2011Building 26 - Technology; Building 27 - Multimedia, Welding; CPDBuilding 27 – exterior windows: July 21, 2011 – 5:00 am to 7:00 am; July 22, 2011 – 5:00 am to 7;00 am

Abatement of Exterior windows on the East side of Building 27 in preparation for the demolition of Buildings 21 - 29 as part of the upcoming CSM North Gateway Part II Project.

Minimal campus impact is expected due to the abatement work:

  1. Walkway between Building 26 and 27 will remain closed during the hours noted above.
  2. Restrooms in Building 26 will not be accessible during hours noted above.

The Contractor will provide caution tape, signage etc. to ensure public safety.

No impacts are expected to vehicular traffic along perimeter roads or to pedestrian traffic on campus.

As always, please proceed with caution near construction zones.

Sajid Sulaiman650 378-7332mailto:sulaimans@smccd.edu7/14/20117/20/2011 1:43 PM
Hillsdale Parking Lot 1F Sidewalk ClosedUse SHIFT+ENTER to open the menu (new window).
North GatewayCollege of San MateoPedestrian Access7/18/20117/20/2011Lot 1 - Hillsdale Lot 1; Lot 1 Upper - Hillsdale Lot 1 UpperMonday, July 18- Wednesday, July 20, 2011
Improvements to road surfaces, pedestrian paths and stairs, lighting, drainage.

Hillsdale Lot 1F sidewalk closure

The sidewalk adjacent to CSM Drive will be closed during this period for reconstruction.

Christine Tai,  Construction Project Manager650 378-7350mailto:taic@smccd.edu7/11/20117/15/2011 8:40 AM
Some parking stalls not available in Bulldog Lot 9AUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoParking7/12/20117/15/2011Lot 9 - Bulldog Lot 9Tuesday, July 12, 2011 through Friday, July 15, 2011
Modernization of landscape, roadways and public open space.

Fence upgrade at Bulldog Lot 9A

Improvements include the modification of the existing fence to a more durable 4’ tall fence. Wheelstops will be installed at the spaces along the fence.

 

Parking stalls adjacent to the fence will not be available during construction. The stair between Lots 9A and 9B will remain open.

Christine Tai,  Construction Project Manager650- 378-7350mailto:taic@smccd.edu7/5/20117/11/2011 1:34 PM
Lower Hillsdale Lots Temporarily ClosedUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoParking5/19/20117/15/2011Lot 1 - Hillsdale Lot 1Lower Hillsdale Lots 1D/ 1E/ 1F: Mid May, 2011 through mid-July, 2011
Improvements to road surfaces, pedestrian paths and stairs, lighting, drainage.
Lots 1D/ 1E/ 1F will be CLOSED beginning on Thursday, May 19, 2011.
 
Lot 1A will be OPEN beginning on Thursday, May 19, 2011. Use the West Perimeter Road entrance.
 
Lots 1B/ 1C will be OPEN beginning on Monday, May 23, 2011.
Christine Tai,  Construction Project Manager650 378-7350mailto:taic@smccd.edu5/12/20115/18/2011 2:18 PM
Center Doors of Theater Lobby ClosedUse SHIFT+ENTER to open the menu (new window).
B2,3 & 4 ModernizationCollege of San MateoPedestrian Access6/27/20117/8/2011Building 3 - TheaterJune 27, 2011 through July 8, 2011  7 am – 4 pm
Construction of the new Fine Arts Courtyard near buildings 2, 3 and 4, including utility improvements, new landscape finishes, planting, and accessible amphitheatre.

Storm drain repairs

 

A 16’ square of courtyard slab to the east of the theater lobby will be removed in order to make repairs to the storm drain line. The center pair of doors to the theater lobby will remain closed during this period. The demolition work on 6/27 and 6/28 will be noisy.

Other doors on the east side of the lobby may need to be closed during this period if the drain pipe is found to be in poor condition.

Christine Tai,  Construction Project Manager650- 378-7350mailto:taic@smccd.edu6/20/20116/23/2011 10:32 AM
Electrical ShutdownUse SHIFT+ENTER to open the menu (new window).
North GatewayCollege of San MateoDisruption6/30/20116/30/2011Building 17 - Faculty Offices; Building 18 - Instructional Facility; Building 20 - EOPS; Building 21 - Cosmetology; Building 22 - Dental Assisting; Building 23 - Nursing Lab; Building 24 - Locker Rooms; Building 25 - Machine Tool; Building 26 - Technology; Building 27 - Multimedia, Welding; CPD; Building 28 - Test Cell; Building 29 - NPA/CIS Labs; Building 20A - Greenhouses; Building 36 - Science/PlanetariumThursday, June 30, 2011 -  5:30 am to 7:30 am

Temporary, short-duration electrical shutdown of buildings (B17, B18, B20, B 21-29 and B36) and exterior areas fed by the New Load Center 8.

The contractor for the New Load Center 8 project must shutdown Load Center 8 which provides power to Buildings B17, B18, B20, B 21-29 and B36, during the scheduled hours shown above.

 

All buildings are expected to be powered back up by 7:30 am.


Campus Public Safety, Facilities Planning and Operations, ITS and Systems Engineers are informed of this proposed short-duration shutdown in order to minimize any impact
.

Sajid Sulaiman,  Construction Project Manager650 378-7332mailto:sulaimans@smccd.edu6/23/20116/29/2011 10:17 AM
Abatement Work In Building 27Use SHIFT+ENTER to open the menu (new window).
North GatewayCollege of San MateoInformation Only6/9/20116/30/2011Building 27 - Multimedia, Welding; CPDStart date June 09, 2011. Expected Completion Date June 30, 2011.
Abatement of South half of Building 27 in preparation for the demolition of Buildings 21 - 29 as part of the upcoming CSM North Gateway Part II Project.
Minimal campus impact is expected due to the abatement work:
Work will be limited to the South half of Building 27 only.
Restrooms in Building 26 will remain functional.
A debris box will be within the fenced area adjacent to Building 26.
The Heating Hot Water Loop to Buildings 25, 26 and 27 will be impacted
The Contractor will provide caution tapes, signage etc. to ensure public safety.
No impacts are expected to vehicular traffic along perimeter roads or to pedestrian traffic within campus.
As always, please proceed with caution near construction zones.
Sajid Sulaiman650 378-7332mailto:sulaimans@smccd.edu6/2/20116/7/2011 3:31 PM
No Power on CampusUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoDisruption6/25/20116/25/2011CSM - Entire CampusSaturday morning, June 25, 2011 12 AM to 4 AM
Modernization of landscape, roadways and public open space.

CAMPUSWIDE POWER SHUTDOWN

 

The power will be turned off on the entire campus in order to safely test the 12 kV line and to make repairs in an electrical load center.

Before you leave for the weekend, please power down computers and electronic equipment. Be aware that small appliances and refrigerators will not be operating during this four hour window.

Christine Tai,  Construction Project Manager650- 378-7350mailto:taic@smccd.edu6/18/20116/23/2011 10:29 AM
Lane Closed on Athletic Loop Road Neear Building 34Use SHIFT+ENTER to open the menu (new window).
Buildings 12/15/17/34 ModernizationCollege of San MateoTraffic6/9/20116/24/2011CSM - Entire CampusJune 9, 2011 through June 17, 2011
CSM B34 Modernization:  Interior and exterior improvements to provide spaces for Information Technology Services (ITS), Shipping/Receiving, and CSM Fire Academy.
LANE CLOSURE- Athletic Loop Road near B34
Sitework along the south side of Building 34 will require one lane of the Athletic Loop Road to be closed intermittently. Flagmen will direct traffic when the lane is closed. This will impact traffic to the Child Development Center, Regional Public Safety Center, and Bulldog Lots 9B/C/D.
Christine Tai,  Construction Project Manager650- 378-7350mailto:taic@smccd.edu6/2/20116/8/2011 2:43 PM
Construction Fencing Near Fine Arts Will Be RemovedUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoInformation Only6/15/20116/15/2011Building 2 - Music; Building 3 - Theater; Building 4 - ArtJuly 15, 2011  8 am – 3 pm
Construction of the new Fine Arts Courtyard near buildings 2, 3 and 4, including utility improvements, new landscape finishes, planting, and accessible amphitheatre.

Concrete deck pour for storm drain repairs

 

There will be a small concrete pour to patch the Fine Arts Courtyard. The concrete will be wheelbarrowed from DaVinci Lot 3.

 

The construction fencing will be removed on the morning of Monday, 7/18, 2011. There will be full access to the theater lobby, immediately thereafter.

Christine Tai,  Construction Project Manager650- 378-7350mailto:taic@smccd.edu6/8/20117/14/2011 3:09 PM
Construction Noise Near Building 36Use SHIFT+ENTER to open the menu (new window).
North GatewayCollege of San MateoNoise6/6/20116/6/2011Building 36 - Science/PlanetariumWednesday, July 6, 2011, 8:00 am to 12:00 noon.

Site concrete activities at Access Road at Southwest corner of Building 36.

The contractor for the New Load Center 8 project will be performing site

concrete work to restore the Access Road near B36 to its original condition.

The Emergency Access Road will remain functional during this work, in case

of an emergency. Pedestrian traffic along the Access Road will be controlled

during the day. Accessible route through Building 36 will remain functional.

Construction work areas will be secured by the contractor using temporary

fences, barricades, caution tapes, signage etc. to ensure vehicular/

pedestrian access and safety.

Some construction noise may be expected during this work.

As always, please proceed with caution near construction zones.

Sajid Sulaiman, Construction Project Manager650 378-7332mailto:sulaimans@smccd.edu5/30/20117/6/2011 10:36 AM
Hillsdale Parking Lot ClosuresUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoParking12/10/20106/1/2011CSM - Entire CampusLots 1A/ 1B/ 1C: December, 2010 through March, 2011, Lots 1D/ 1E/ 1F: Late March, 2011 through early June, 2011
Improvements to road surfaces, pedestrian paths and stairs, lighting, drainage. Trees will be trimmed or removed for safety, tree health, and maintenance.

Upcoming Hillsdale Parking Lot Closures:

 

Lot 1A CLOSED Monday, 12/6 through Wednesday, 12/8.

 

Lots 1B/ 1C CLOSED 12/9 and 12/10

 

Lots 1A/ 1B/ 1C to be closed beginning 12/14.

 

Use Lots 1D/ 1E/ 1F as alternatives.

Please click here for map (pdf)

Christine Tai,  Construction Project Manager650 378-7650mailto:taic@smccd.edu12/3/201012/1/2010 4:33 PM
Crane in Turnaround Circle Near Building 5Use SHIFT+ENTER to open the menu (new window).
B5NCollege of San MateoTraffic5/18/20115/18/2011Building 5 - Health and WellnessWednesday, May 18, 2011  6:00 AM to 7:00 AM
New Building, warranty roof repairs, deliver materials for the repairs.
Truck crane will be parked in the turnaround circle yellow zone west of Building 5. 
 
Click here for map (Adobe PDF)
Sajid Sulaiman,  Construction Project Manager650- 378-7332mailto:sulaimans@smccd.edu5/11/20115/17/2011 1:09 PM
Construction Near Marie Curie Lot 5 and Building 36Use SHIFT+ENTER to open the menu (new window).
North GatewayCollege of San MateoPedestrian Access; Parking5/2/20115/13/2011Building 36 - Science/PlanetariumMonday, May 2, 2011 To Friday May 13, 2011.
Trenching, conduits and backfill activities near Building 36.
May 2, 2011 to May 13, 2011 – The contractor for the New Load Center 8 project will be performing trenching, conduit placement and backfill activities between existing Load Center 4 (under B36 Bridge) and new Load Center 8 (near Marie Curie Lot 5).
 
Construction work areas will be secured by the contractor using temporary fences, barricades, caution tapes, signage etc. to ensure vehicular/ pedestrian access and safety. The contractor will be using trucks, excavators, and other equipment in the vicinity of the Emergency Access Road.
 
The Contractor will keep the Emergency Access Road functional during this work, in case of an emergency.
 
Exterior stair to the West of B36 Bridge will remain closed during this work.
 
Some construction noise may be expected during this work.
As always, please proceed with caution near construction zones.
Sajid Sulaiman,  Construction Project Manager650 378-7332mailto:sulaimans@smccd.edu4/25/20115/2/2011 10:07 AM
Six Parking Stalls Barricaded at District Office Parking LotUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoParking5/9/20115/9/2011Building A - District OfficeMonday May 9, 2011
District Office Parking Lot Geological Borings
A large truck mounted drill rig will be drilling a total of four borings in the rear District Office Parking Lot. A total of six parking stalls will be barricaded closed designating the drill areas. Once completed, the borings will be filled with concrete and areas closed until material has hardened. Please see attached map for details on locations
Roger Anchartechahar650-358-6844mailto:anchartechaharr@smccd.edu5/2/20115/4/2011 10:33 AM
Temporary Loss of 3 Parking Spaces in Beethoven LotUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoParking5/5/20115/6/2011Lot 2 - Beethoven Lot 2May 5th-May 6th
Modernization of landscape, roadways and public open space

In parking lot Beethoven, south lot, three (3) parking stalls will be used to place a debris box to haul away plant material.

Click here for map.

Christine Tai,  Construction Project Manager650 378-7350mailto:taic@smccd.edu4/28/20115/3/2011 2:37 PM
Slow Moving Vehicles on East Perimeter RoadUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoTraffic5/5/20115/5/2011CSM - Entire CampusThursday, May 5, 2011 from 7 AM to 3 PM
Modernization of landscape, roadways and public open space.
Asphalt paving of softball field parking lot

Please be aware of slow moving vehicles on East Perimeter Road. Flagmen will monitor vehicular traffic at the construction gate located to the south of the softball field.
There may be unpleasant odors in the vicinity of the paving materials.
Christine Tai,  Construction Project Manager650- 378-7350mailto:taic@smccd.edu4/28/20115/4/2011 10:24 AM
Excavation Near Building 36Use SHIFT+ENTER to open the menu (new window).
North GatewayCollege of San MateoNoise4/18/20114/29/2011Building 36 - Science/PlanetariumMonday, April 18, 2011 To Friday April 29, 2011
Excavation, trenching and backfill activities near Building 36.
April 18 to April 29, 2011 – The contractor for the New Load Center 8 project will be performing excavation, trenching, and backfill activities between existing Load Center 4 (under B36 Bridge) and new Load Center 8 (near Marie Curie Lot 5).
 
Construction work areas will be secured by the contractor using temporary fences, barricades, caution tapes, signage etc. to ensure vehicular/ pedestrian access and safety.
 
The Emergency Access Road will remain functional during this work.
Exterior stair to the West of B36 Bridge will remain closed during this work.
 
Some construction noise may be expected during this work.
As always, please proceed with caution near construction zones.
Sajid Sulaiman,  Construction Project Manager650 378-7332mailto:sulaimans@smccd.edu4/11/20114/14/2011 10:01 AM
Slow Moving Vehicles on West Hillsdale BlvdUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoTraffic4/19/20114/26/2011CSM - Entire CampusApril 19, 2011 through April 26, 2011 8 AM through 5 PM
Improvements to road surfaces, pedestrian paths and stairs, lighting, drainage.
Delivery of asphalt paving materials to Hillsdale Parking Lots 1A/ 1B/ 1C on several days during this period .
 
Please be aware of slow moving vehicles on West Hillsdale Boulevard and West Perimeter Road. Six truckloads will be delivered per hour. Flagmen will monitor vehicular traffic at the West Perimeter Road construction gate.

There may be unpleasant odors in the vicinity of the paving materials.
Christine Tai,  Construction Project Manager650 378-7350mailto:taic@smccd.edu4/12/20114/18/2011 12:26 PM
Sidewalk on North Side of Beethoven Lot 2 ClosedUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoPedestrian Access; Traffic4/20/20114/20/2011Building 2 - MusicApril 20, 2011 from 6 AM through 5 PM
Improvements to road surfaces, pedestrian paths and stairs, lighting, drainage.
Delivery of Sod.  Material to be delivered by trucks to open space North of Building 2 from 6:00 AM to 5:00 PM. Sidewalk on the North side of the Lot will close for half the day, 6:00 AM to 1:00 PM. Flagmen will be provided for the duration when the sidewalk will be closed off by the Contractor. Da Vinci Lot 3 will be impacted at the West Side where trucks will park during the Sod delivery.
Roxana Usner,  Construction Project Manager650 378-7360mailto:usnerrr@smccd.edu4/13/20114/18/2011 4:13 PM
Excavation, trenching and site demolition activities near Building 36Use SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoPedestrian Access4/4/20114/15/2011Building 36 - Science/PlanetariumMonday, April 4, 2011 To Friday April 15, 2011.

Excavation, trenching and site demolition activities near Building 36.

The contractor for the New Load Center 8 project will be performing excavation, trenching and site demolition activities near Building 36.
April 4 to April 8, 2011 – Demolition of landing along the exterior stair to the West of B36 Bridge, and trenching across access road leading down to Marie Curie Lot 5.
 
April 4 to April 15, 2011 – Excavation, trenching, and backfill activities between existing Load Center 4 (under B36 Bridge) and new Load Center 8 (near Marie Curie Lot 5)
 
Exterior stair to the West of B36 Bridge will remain closed during this work.
 
The Emergency Access Road will remain functional during this work.
Some construction noise may be expected during this work.
Construction work areas will be secured by the contractor using temporary fences, barricades, caution tapes, signage etc. to ensure vehicular/ pedestrian access and safety.
 
As always, please proceed with caution near construction zones.
Sajid Sulaiman,  Construction Project Manager650 378-7332mailto:sulaimans@smccd.edu3/28/20114/4/2011 1:42 PM
Cooled Air Systems Not AvailableUse SHIFT+ENTER to open the menu (new window).
Buildings 12/15/17/34 ModernizationCollege of San MateoInformation Only4/8/20114/8/2011Buidling 10 - College Center; Building 5 - Health and Wellness; Building 9 - Library/KCSMThursday, April 7, 2011 5 AM – 7 AM
CSM Building 34 – Chiller Plant

The chiller plant will be taken out of commission during this period in order to perform work on the plant’s electrical panel. This will impact the cooled air systems in Buildings 5, 9, and 10 during these early morning hours.

Christine Tai,  Construction Project Manager650- 378-7350mailto:taic@smccd.edu4/1/20114/5/2011 3:39 PM
No Power in Buildings 21-29 & 36Use SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoDisruption4/4/20114/5/2011Building 27 - Multimedia, Welding; CPD; Building 28 - Test Cell; Building 29 - NPA/CIS Labs; Building 21 - Cosmetology; Building 22 - Dental Assisting; Building 23 - Nursing Lab; Building 24 - Locker Rooms; Building 25 - Machine Tool; Building 26 - Technology; Building 36 - Science/PlanetariumMonday, April 4, 2011 -  6:00 am to 8:00 am; Tuesday, April 5, 2011 - 6:00 am to 8:00 am 

Temporary, short-duration electrical shutdown of buildings (B17, B18, B20, B 21-29 and B36) and areas fed by existing Load Center 4, in preparation for Electrical cutover to New Load Center 8 in June, 2011.

The contractor for the New Load Center 8 project must  shutdown Load Center 4 which provides power to Buildings B17, B18, B20, B 21-29 and B36, during the scheduled hours shown above.

 

Buildings and areas fed by the Existing Load Center 4 will remain without power from 6:00 am to 8:00 am, on Monday, April 4, 2011 and Tuesday, April 5, 2011.

 

All buildings are expected to be powered back up by 8:00 am.


Campus Public Safety, Facilities Planning and Operations, ITS and Systems Engineers have been informed of this proposed shutdown and are working with our team to minimize impacts. During the power shut down the buildings will be secured by the Access Controls System and will also be under observation by campus Public Safety.

Sajid Sulaiman,  Construction Project Manager650 378-7332mailto:sulaimans@smccd.edu3/28/20114/4/2011 1:46 PM
Tree Pruning in Various LocationsUse SHIFT+ENTER to open the menu (new window).
North GatewayCollege of San MateoParking; Pedestrian Access3/11/20114/1/2011CSM - Entire CampusVarious
Tree pruning for safety, tree health, and maintenance.

Please see this campus map for Tree Maintenance/Pruning locations.

 

3/11/2011 TO 3/15/2011:

A section of the West perimeter Road adjacent to Galileo Lot 6A will be closed to through traffic. Traffic will be rerouted through Galileo Lot 6A during the tree pruning work.

 

3/16/2011 to 3/22/2011:

Approx. 15 Parking stalls in Galileo Lot 6B will be in use for staging truck, chipper and other equipment during tree pruning work.

 

3/23/2011 To 4/1/2011:

Truck, chipper and other equipment will be on Shoulder of the East Perimeter Road during tree pruning work. Minimal traffic impact is expected during this work.

 

Emergency vehicle access will be maintained at all times.

 

The Contractor will provide signage, flag persons, etc. to mitigate impact and ensure vehicular/pedestrian access and safety.

 

As always, please proceed with caution near construction zones.
Sajid Sulaiman,  Construction Project Manager650 378-7332mailto:sulaimans@smccd.edu3/4/20113/10/2011 5:35 PM
Scrap Material Removal Near Buildings 25,27 and ITS Parking LotUse SHIFT+ENTER to open the menu (new window).
North GatewayCollege of San MateoDisruption2/5/20114/1/2011Building 25 - Machine Tool; Building 26 - TechnologyFebruary 5 through approximately April 1.
Conversion of outdated structures to a pleasing amphitheater, lighted walkways and meeting destination surrounded by landscaped parking. Scope of work includes demolition of 1960s-era concrete buildings after clearing of contents and abatement.
 
Work will begin on Saturday, February 5, on the removal of scrap materials stockpiled over the years for the industrial arts programs help at the North end of campus. Contractors will sort and load metals into recycle boxes placed near B27. All will be either recycled with profits accruing to the District or auctioned when possible. This work will be ongoing for several weeks this Spring semester.
Initial phases of this process will be done on the weekend to limit visitor, staff and student exposure to machinery and heavy materials involved in this work. The area impacted will be limited to the B25, 27, walkway next to B27, and the ITS parking lot. .All efforts will be made to work around class schedules in this area, and strict attention to safety concerns will be observed..
Pepper Powell650 358-6811mailto:powellp@smccd.edu1/29/20112/3/2011 12:22 PM
Slow-Moving Trucks on West Hillsdale BlvdUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoTraffic3/14/20113/31/2011CSM - Entire CampusMarch 14, 2011 through March 31, 2011
Improvements to road surfaces, pedestrian paths and stairs, lighting, drainage.

Delivery of asphalt paving materials to Hillsdale Parking Lots 1A/ 1B/ 1C on several days during this period

 

Please be aware of slow moving vehicles on West Hillsdale Boulevard and CSM Drive. Six truckloads will be delivered per hour. Flagmen will monitor pedestrian and vehicular traffic at the CSM Drive construction gate.

There may be unpleasant odors in the vicinity of the paving materials.

Christine Tai,  Construction Project Manager650 378-7350mailto:taic@smccd.edu3/7/20113/11/2011 3:36 PM
West Stair at Building 36 ClosedUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoPedestrian Access3/11/20113/13/2011Building 36 - Science/PlanetariumFriday, March 11- Sunday, March 13, 2011 (if needed)
Repair of damage caused by water leak on west stair

Closure of the West Stair, located closest to Marie Curie Lot 5

Equipment and scaffolding will be set up outside and inside the stair for water testing and repairs.

Please use the elevator or alternate building stairs.

 

Stairwell restoration will occur during the Spring Recess.

Christine Tai,  Construction Project Manager650 378-7350mailto:taic@smccd.edu3/4/20113/9/2011 11:47 AM
Sidewalk closure near West Hillsdale BoulevardUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoPedestrian Access3/8/20113/9/2011CSM - Entire CampusTuesday, March 8- Wednesday, March 9, 2011 6:30 AM through 4 PM
Improvements to road surfaces, pedestrian paths and stairs, lighting, drainage.

CSM Drive Sidewalk closure near West Hillsdale Boulevard

A portion of the north sidewalk on CSM Drive will be closed for reconstruction of the traffic island into Hillsdale Lot 1C. Crossing guards will guide pedestrians from the lower Hillsdale Parking Lots 1D/ 1E/ 1F to a detour route along the south sidewalk.

Christine Tai,  Construction Project Manager650 378-7350mailto:taic@smccd.edu3/1/20113/7/2011 2:17 PM
Five Parking Stalls in Beethoven Lot 2 Will Be BlockedUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoParking3/4/20113/9/2011Lot 1 Upper - Hillsdale Lot 1 UpperFriday, March 4, 2011 through Wednesday, March 9, 2011
Modernization of landscape, roadways and public open space.

Five parking stalls in Beethoven Lot 2 near CSM Drive will be blocked off for electrical work during this period.

This electrical work will lead to the use of energy efficient fixtures and improved light levels for safety in the Hillsdale Parking Lots.
Christine Tai,  Construction Project Manager650- 378-7350mailto:taic@smccd.edu2/25/20113/1/2011 8:18 AM
Detours at Campus EntrancesUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoTraffic12/20/201012/30/2010CSM - Entire CampusMonday, December 20  through Thursday, December 30, 2010 (weather permitting)
Modernization of landscape, roadways and public open space.

Construction of roadway medians and bollards at both campus entrances:

 

W. Hillsdale Blvd., at College Heights Drive and

W. Hillsdale Blvd. at CSM Drive.

 

Vehicular access to all parts of campus will be maintained.

Detours are as follows:

 

  • All vehicles to exit campus via W. Hillsdale Blvd.
  • No vehicular exit allowed via CSM Drive and College Heights Drive.
  • No vehicular right turns from W. Hillsdale Blvd. onto CSM Drive.
  • College Heights Dr. closed from Aquatics Lane to W. Hillsdale Blvd. in campus exit direction only.

 

No impact to pedestrian traffic.  Accessible paths of travel will not be affected.

Roxana Usner, Construction Project Manager650-393-3940mailto:usner@smccd.edu12/13/201012/20/2010 11:07 AM
Building 12 South Door Temporarily ClosedUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoPedestrian Access11/16/201012/6/2010Building 12 - Physical ScienceTuesday, November 16, 2010 through Monday, December 6, 2010
Modernization of landscape, roadways and public open space.

Exit at south side of B12, (B10 side door), will be temporarily closed.  Pedestrians will use exit at east side (Bookstore side) of B12 to/from the Bookstore and other destinations. 

 

Due to construction activities, significant noise will occur from

Wednesday, Nov. 17 through Friday, Nov. 19.

 

Accessible paths of travel will not be affected.

Roxana Usner, Construction Project Manager650-393-3940mailto:usner@smccd.edu11/9/201011/30/2010 9:44 AM
Workers Installing Speakers Throughout CampusUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoInformation Only11/16/201012/6/2010CSM - Entire CampusTuesday, November 16, 2010 through Monday, December 6, 2010
Add speakers to enable broadcasts inside of buildings

Workers will be on ladders installing ceiling and wall speakers.

 

No significant noise will occur during this project.

 

Electricians will safe-off areas [using ‘Caution Tape and Cones] for short periods of time as they move through the campus. Accessible paths of travel will not be affected. Exercise caution when overhead work is in process.

Patty Della Bona, Project Manager650-358-6862mailto:dellabonap@smccd.edu11/9/201011/30/2010 9:46 AM
Exterior Stairs at Building 12 ClosedUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoPedestrian Access10/25/201011/1/2010Building 12 - Physical ScienceMonday, October 25th 7:00am - Monday, November 1, 2010 7:00 am
Modernization of landscape, roadways and public open space.

Exterior Stair at B12 (Bookstore side) will be closed.  Pedestrians will use interior stair/elevator for access through B12 to/from the Bookstore and other destinations.

 

Accessible paths of travel will not be affected.

Roxana Usner, Construction Project Manager650-393-3940mailto:usner@smccd.edu10/18/201011/3/2010 9:59 AM
Boring Machine Near Staff Lot 3Use SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoDisruption10/23/201010/24/2010Lot 2 - Beethoven Lot 2Saturday, October 23rd & Sunday, October 24th   7:00am – 5:00pm
AT&T has been given approval to repair broken conduits below the sidewalk between B1 and B2 and the colonnades and reflecting pool. This work will be done by boring underground to preserve our new sidewalks and parking lot asphalt.

AT&T will stage a large, underground boring machine in the S/E corner of the DaVinci, Staff Parking Lot 3, along the curb. Additional smaller, earth moving equipment will dig an entrance trench in the grass area near the colonnades and a destination trench in the planter area close to building 2. After completing their underground trench AT&T will then be able to pull new fiber to fix the break.

 

Accessible paths of travel will not be affected.

Patty Della Bona, Project Manager650-222-5764mailto:dellabonap@smccd.edu10/16/201011/3/2010 9:46 AM
East Perimeter Road, in front of the Bookstore and Bulldog Lot 9A, will be closed for paving.Use SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoTraffic10/21/201010/22/2010CSM - Entire CampusThursday, October 21, 2010 through Friday, October 22, 2010
Modernization of landscape, roadways and public open space.

East Perimeter Road, in front of the Bookstore and Bulldog Lot 9A, will be closed for paving.

 

The closure will be done in phases to allow access to Athletic Loop Road at all times. 

 

Traffic control personnel will assist vehicular traffic for the duration of the road closures.

 

Pedestrian travel will not be affected.

Accessible paths of travel will not be affected.

Roxana Usner, Construction Project Manager650-393-3940mailto:usner@smccd.edu10/14/201011/3/2010 10:01 AM
Increased Truck Traffic on Hillsdale and East Perimeter RoadUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoTraffic10/20/201010/22/2010CSM - Entire CampusWednesday, October 20, 2010 through Friday, October 22, 2010

Modernization of landscape, roadways and public open space.

There will be increased truck traffic on West Hillsdale Blvd, West and East Perimeter Roads. 

 

Pedestrian travel will not be affected.

Accessible paths of travel will not be affected.

Roxana Usner, Construction Project Manager650-393-3940mailto:usner@smccd.edu10/13/201011/3/2010 9:49 AM
Building 4 Stairs ClosedUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoDisruption; Pedestrian Access10/18/201010/22/2010Building 4 - ArtMonday, October 18th at 7:00am – Friday, October 22nd at 5:00 pm
Modernization of landscape, roadways and public open space.

Portions of the Stairway and Elevator at Building 4 will be closed for construction activities

 

On Monday and Tuesday, accessible paths of travel will be:

·         Elevator and ramp at Fine Arts Courtyard near Davinci Lot 5

·         Ramp at Beethoven Lot & Health and Wellness Building 5

 

On Wednesday and Thursday, all traffic to use elevator in lieu of Building 4 stairway.

 

On Friday, stair and elevator will be open during minor construction completion tasks.

Roxana Usner, Construction Project Manager650-393-3940mailto:usner@smccd.edu10/11/201011/3/2010 9:55 AM
Stairs in Building 5 will be closed for repairs Use SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoPedestrian Access10/20/201010/21/2010Building 5 - Health and WellnessWednesday, October 20, 2010 and Thursday, October 21, 2010
Modernization of landscape, roadways and public open space.

Stairs in Building 5 will be closed for repairs as follows:

 

Stairs 1 and 2  -  6:00 PM to 10:00 PM 

Stair 3  -  10:00 PM to 2:00 AM

 

 

Accessible paths of travel will not be affected.

Roxana Usner, Construction Project Manager650-378-7360mailto:usner@smccd.edu10/13/201011/3/2010 10:04 AM
Truck Crane Near Building 5Use SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoInformation Only10/18/201010/18/2010Building 5 - Health and WellnessMonday, October 18, 2010 between  5:30 am and 7:00 am
Modernization of landscape, roadways and public open space.

A truck crane will be staged on Aquatic Lane to perform work on B5 rooftop.  Traffic control/pedestrian control personnel will be staged at the location for the duration of the work.

 

Accessible paths of travel will not be affected.

Roxana Usner, Construction Project Manager650-393-3940mailto:usner@smccd.edu10/11/201011/3/2010 9:52 AM
Some stairs in Building 5 UnavailableUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoPedestrian Access10/7/201010/9/2010Building 5 - Health and WellnessOctober 7 through 9, 2010
Slate Stairs Improvements

Stair #1 will not be accessible on 10/07/10, between 6:00PM – 4:00AM.  Pedestrians will be redirected to the elevator.

 

Stair #3 will not be accessible on 10/08/10, 6:00PM – 4:00AM.

Pedestrians will be redirected to the elevator.

 

Stair #2 will not be accessible on 10/09/10, 9:00AM – 6:00PM.

Pedestrians will be redirected to the elevator.

 

All closed areas will be cautioned taped for the above dates.

Stairs will be made accessible in the event of an emergency.

Roxana Usner(650) 378-7360mailto:rusner@smccd.edu9/30/201010/7/2010 11:27 PM
Partial No Water On CampusUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoDisruption9/11/20109/11/2010Building 34 - Bookstore; Building 35 - Moore RPSCSaturday, September 11th – 6:00 am to 5:00 pm
CSM  CIP2 Design Build Project Sitework Project

Water will be shut off at the following areas:

Buildings 34 and 35, Child Development Center and Softball Field

 

Pedestrian and vehicular access will remain open.

Accessible paths of travel will not be affected.

Roxana Usner, Construction Project Manager650-378-7360mailto:usner@smccd.edu9/4/201010/5/2010 8:31 AM
SMAC Showers Not AvailableUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoDisruption9/4/20109/10/2010Building 5 - Health and WellnessSaturday, September 4th – Friday, September 10th
CSM CIP2 Design Build Project

San Mateo Athletic Club Showers in Building 5 will be closed for repairs. 

 

Building 8 showers will be available for use for the duration of the repair work.

 

Accessible paths of travel will not be affected.

Roxana Usner, Construction Project Manager650-378-7360mailto:usner@smccd.edu8/28/20109/3/2010 10:25 AM
One-Way Traffic on Eastern Loop Road - 1/15/2009-1/21/2011Use SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoDisruption; Pedestrian Access; Traffic1/15/20098/21/2010CSM - Entire CampusJanuary 15, 2009 to August 21, 2010
Project Description
Campus impact
Charles Beeler, Construction Project Manager650-378-7345  mailto:beelerc@smccd.edu1/8/20091/14/2009 5:29 PM
Western Loop Road (Near Building 19) ClosedUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoDisruption; Traffic6/1/20108/16/2010CSM - Entire CampusJune 1, 2010 to August 16, 2010
Modernization of landscape, roadways and public open space.

Area north and east of Building 1 between the loop road and spine will be closed for construction.

 

Area west and south of Building 19 will be closed for construction.

Please see attached drawings showing fence lines.
 
Roxana Usner  Construction Project Manager650-378-7360mailto:usnerr@smccd.edu5/25/20106/1/2010 4:25 PM
East Perimeter Road ClosedUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoTraffic; Parking8/2/20108/15/2010CSM - Entire CampusMonday, August 2nd  through  Sunday, August 15th, 2010
Modernization of landscape, roadways and public open space.

Contractors will re-pave CSM East Perimeter Road.

 

East Perimeter Road will be closed between Bulldog Lot 9F, formerly Lot 14 and B34.

 

Accessible paths of travel will not be affected. Pedestrian and vehicular traffic is not permitted on closed portions of road during construction.

Roxana Usner, Construction Project Manager650-393-3940mailto:usner@smccd.edu7/26/20107/30/2010 2:32 PM
East Perimeter Road Closed Betwen Lot 9F and B34Use SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoPedestrian Access; Traffic8/2/20108/15/2010CSM - Entire CampusMonday, August 2nd  through  Sunday, August 15th, 2010
Modernization of landscape, roadways and public open space.

Contractors will re-pave CSM East Perimeter Road.

 

East Perimeter Road will be closed between Bulldog Lot 9F, formerly Lot 14 and B34.

 

Accessible paths of travel will not be affected. Pedestrian and vehicular traffic is not permitted on closed portions of road during construction.

Roxana Usner, Construction Project Manager650-393-3940mailto:usner@smccd.edu7/26/20108/3/2010 11:07 AM
No Access to Building 4 "StElevator" Use SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoPedestrian Access8/9/20108/14/2010Building 4 - ArtMonday, August 9, 2010 through Saturday, August 14, 2010
Modernization of landscape, roadways and public open space.

StElevator, new stair and elevator at B4A, will be closed for construction activities.  Pedestrian travel and accessible paths of travel at this location will be blocked.

 

Accessible paths of travel from Beethoven and Davinci Lots will remain open for use while the Stelevator is closed.

Roxana Usner, Construction Project Manager650-393-3940mailto:usner@smccd.edu8/2/20108/4/2010 2:33 PM
No Water in FountainsUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoInformation Only8/9/20108/13/2010Building 4 - ArtMonday, August 9  through Friday, August 13, 2010
Modernization of landscape, roadways and public open space.

Contractors will be working at the two new water fountains located outside of Fine Arts Courtyard and Building 9.  

 

Fountains will have no water during the timeframe noted above.  The work does not generate excessive noise or dust.

 

No impact to pedestrian traffic.  Accessible paths of travel will not be affected.
Roxana Usner, Construction Project Manager650-393-3940mailto:usner@smccd.edu8/2/20108/12/2010 12:29 PM
East Perimeter Road ClosedUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoTraffic6/22/20108/11/2010CSM - Entire CampusTuesday, June 22, 2010 through August 11, 2010
Modernization of landscape, roadways and public open space.

Contractors will pave CSM East Perimeter Road in phases, starting with the southern portion at Hillsdale Drive.

 

See this map for dates portions of the road will be closed.

 

Accessible paths of travel will not be affected. Pedestrian and vehicular traffic is not permitted on closed portions of road during construction.

Roxana Usner, Construction Project Manager650-393-3940mailto:usner@smccd.edu6/15/20106/23/2010 3:46 PM
CSM Drive Closed Between Hillsdale and Theater LotUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoTraffic8/6/20108/9/2010CSM - Entire CampusFriday, August 6th – Monday, August 9th
Modernization of landscape, roadways and public open space.

CSM Drive will be closed between W. Hillsdale Blvd. and Theatre Lane for pavement patching work. 

 

Work will not be performed during Farmers Market Activities on Saturday.

 

Pedestrian paths of travel will remain open.

 

Accessible paths of travel will not be affected.

Roxana Usner, Construction Project Manager650-393-3940mailto:usner@smccd.edu7/30/20108/5/2010 5:05 PM
East Perimeter Road Closed for Concrete PourUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoPedestrian Access; Traffic8/3/20108/3/2010Building 9 - Library/KCSMTuesday, August 3rd, 6:00 am to 3:00 pm
Modernization of landscape, roadways and public open space.

Concrete pour at B9 Southeast lawn area will block access road from East Perimeter Road to B9 loading dock. 

 

No vehicles or pedestrians will be allowed access. See attached drawing.

 

Accessible paths of travel will not be affected.

Roxana Usner, Construction Project Manager650-378-7360mailto:usner@smccd.edu7/27/20108/3/2010 11:04 AM
Increased Truck Traffic on East Loop Road near Building 10Use SHIFT+ENTER to open the menu (new window).
North GatewayCollege of San MateoTraffic7/31/20108/2/2010Buidling 10 - College CenterSaturday, July 31 through Monday, August 2.
To make room for continued improvements to roadways and parking the “trailer village” around B10 will be dismantled. 

Minimal during the weekend.  Work will primarily occur in the trailer village behind B10.

 

Increased truck traffic on Monday on short portion of east loop road from trailer to B21 and B22 to store contents.
Pepper Powell650-222-5816mailto:powellp@smccd.edu7/24/20107/28/2010 10:32 AM
Work Around Building 22Use SHIFT+ENTER to open the menu (new window).
North GatewayCollege of San MateoInformation Only7/7/20107/31/2010Building 22 - Dental AssistingBeginning Wednesday, July 7, 2010, Rodan Builders will commence un-installing equipment in recently abandoned dental building for pick up by successful bidders. Work will take up to two days, beginning at 7:00 am in CSM B22. 
Revitalization of north of campus, including redesigned parking lots and lighting and addition of the “Plaza of the Sun” with seating, lighting and landscape elements
Because all of the programs are currently out or moving out of the B21 – through B24 complex I do not expect any campus impact. The work is limited to B22 interior with only 1 truck and 2 workers involved.
Pepper Powell650-222-5816mailto:powellp@smccd.edu6/30/20107/6/2010 1:08 PM
Trucks on Loop RoadUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoTraffic7/23/20107/24/2010CSM - Entire CampusFriday, July 23rd, through end of day Saturday, July 24th
Modernization of landscape, roadways and public open space.

This Friday and Saturday, large dump trucks will enter and exit campus via East Perimeter Road to off-haul dirt from Galileo Lot 6, (formerly Lot 10).

 

Pedestrian and accessible paths of travel will not be affected.
Roxana Usner, Construction Project Manager650-378-7360mailto:usner@smccd.edu7/16/20107/23/2010 3:40 PM
Access to Hillsdale Parking Lots LimitedUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoParking7/16/20107/16/2010Lot 1 - Hillsdale Lot 1July 16, 2010 – 7:00 A.M. TO 6:00 P.M.
Soils testing in preparation for repaving of Hillsdale Parking Lots. Advance Soil Technology, Inc. will bring a small drilling rig onsite to perform shallow exploratory borings. Boreholes will be grouted immediately following testing.

Access to Hillsdale Parking Lots will be limited

Mary Ann Duggan650-222-5135mailto:dugganm@smccd.edu7/9/20107/13/2010 2:28 PM
No Gas Service on CampusUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoDisruption7/10/20107/12/2010CSM - Entire CampusSaturday, July 10, 2010 – Monday, July 12, at 6:00 am
Modernization of landscape, roadways and public open space.

Gas service will be disrupted throughout the weekend and restored Monday morning at 6:00 am.  

 

Fitness Center Pool heating will not be affected.

Roxana Usner, Construction Project Manager650-393-3940mailto:usner@smccd.edu7/3/20107/14/2010 9:27 AM
Dump Trucks on Loop Road - 7/9-11/10Use SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoTraffic7/9/20107/11/2010CSM - Entire CampusFriday, July 9th, through Sunday, July 11th
Modernization of landscape, roadways and public open space.

This  Friday, Saturday, and Sunday, dump trucks will enter and exit campus via East Perimeter Road to off-haul dirt from Galileo Lot 6, (formerly Lot 10).

 

Pedestrian and accessible paths of travel will not be affected.

Roxana Usner, Construction Project Manager650-378-7360mailto:usner@smccd.edu7/2/20107/14/2010 12:19 PM
No Power in Building 15 - 7/10/10Use SHIFT+ENTER to open the menu (new window).
Buildings 12/15/17/34 ModernizationCollege of San MateoDisruption7/10/20107/10/2010Building 15 - Faculty OfficesSaturday, July 10, 2010  Between the hours of 6:00 am – 3:30 pm
Modernization of restrooms, offices, hallways

POWER SHUTDOWN TO BUILDING 15

 

Electrical work for CSM Building 15 will require that the power to CSM Building 15 be COMPLETELY turned off.

CSM Building 15 will be closed to public access during this time.

 

Life safety, Security, BMS and lighting will be affected.

Ron Gaither,  Construction Project Manager415-830-2962  mailto:gaitherr@smccd.edu7/3/20107/14/2010 12:16 PM
Trucks on Loop Road Behind Building 22 - 7/9/10Use SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoInformation Only7/9/20107/9/2010Building 22 - Dental AssistingFriday, July 9, 9:00 am to noon
Beautification and modernization of the parking lots and new north entrance to the campus with new lighting, an informal outdoor gathering space and landscaping. To achieve this greatly needed improvement, the outdated buildings currently being abandoned by active programs will be demolished. The outmoded equipment and furnishings contained within are being auctioned off to renew resources for their divisions. This week begins the first of these many rounds of pick-ups by successful bidders.
There will be trucks and other vehicles making their way to the east side of the loop road behind B22, utilizing various means to load dental chairs, cabinets and x-ray equipment. Since there is little to no student activity on Fridays there is little anticipated campus disruption.
Pepper Powell650 222-5816mailto:powellp@smccd.edu7/2/20107/14/2010 11:56 AM
Construction Noise Near Building 9Use SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoNoise6/30/20107/7/2010Building 9 - Library/KCSMThursday, June 30, 2010 through Wednesday, July 7, 2010
Modernization of landscape, roadways and public open space.

Contractors will be working at the lawn southwest of Building 9.  Pile driving and other noise-making construction activities will be performed

 

No impact to B9 deliveries, vehicular or pedestrian traffic.  Accessible paths of travel will not be affected.

Roxana Usner, Construction Project Manager650-393-3940mailto:usner@smccd.edu6/23/20107/6/2010 11:10 AM
Contractors Working at Water FountainsUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoInformation Only6/28/20107/1/2010Building 3 - TheaterMonday, June 28, 2010 through July 1, 2010
Modernization of landscape, roadways and public open space.
Contractors will be working at the two new water fountains located outside of Fine Arts Courtyard and Building 9.   No impact to pedestrian traffic. 
Roxana Usner, Construction Project Manager650-393-3940mailto:usner@smccd.edu6/21/20106/25/2010 11:24 AM
Entrance to Building 18 Restricted to Parking Lot SideUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoInformation Only6/11/20106/18/2010Building 18 - Instructional FacilityFriday, June 11, 2010 to Friday, June 18, 2010
Modernization of landscape, roadways and public open space.

Bridge and ramp at Building 18, 2nd floor, will be closed for concrete finishing work.

 

Accessible path of travel will not be affected.

 

Entrance to Building 18 will be restricted to west entry (parking lot side).
Roxana Usner  Construction Project Manager650-378-7360mailto:usnerr@smccd.edu6/4/20106/11/2010 8:39 AM
No Gas Service on CampusUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoDisruption5/17/20105/25/2010CSM - Entire CampusFriday, September 17th at 10:30 am - Monday, September 20, 2010 at 8:00 am
Modernization of landscape, roadways and public open space.

Natural Gas line will be shut off this weekend, beginning Friday, September 17 at 10:30 am for maintenance purposes. 

 

Natural Gas is expected to be restored to all affected buildings, except for Building 30, no later than the following Monday morning at 8:00 am, September 20th. 

 

The  shutdown will affect only the following:

1.       Heat and hot water to Buildings 30 and 35,

2.       Heat to the bookstore,

3.       Green house heaters at Building 20,

4.       Kilns at Building 4,  

5.       Gas-powered Bunsen burners in B36, and

6.       Gas appliances at the mobile kitchen.

 

Heat and hot water to the pools will NOT be affected.

 

Heat and hot water to Building 30 is expected to be restored approximately one week later, Monday, September 27, 2010.
Roxana Usner, Construction Project Manager650-393-3940mailto:usner@smccd.edu5/10/20109/15/2010 2:00 PM
Contractors in Fine Arts CourtyardUse SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoInformation Only5/10/20105/11/2010Building 3 - TheaterMonday, May 10 through Tuesday, May 11, 2010
Modernization of landscape, roadways and public open space.

Contractors will be building concrete forms and pouring small patches of concrete at the green screen trellises in the Fine Arts Courtyard.

 

Pedestrian traffic will be maintained at all times.  Accessible path of travel will not be affected.

Roxana Usner, Construction Project Manager650-393-3940mailto:usner@smccd.edu5/3/20105/7/2010 10:46 AM
First Floor of Building 12 Closed - 1/11/10 - 4/30/10Use SHIFT+ENTER to open the menu (new window).
Buildings 12/15/17/34 ModernizationCollege of San MateoPedestrian Access1/11/20104/30/2010Building 12 - Physical ScienceMonday, January 11, 2010 through April, 2010
Modernization of restrooms, offices, hallways

CONSTRUCTION at CSM BUILDING 12, FIRST FLOOR

 

The first floor restrooms and the interior stairwell will be closed to public access. For access to or from the mall to the Bookstore, the elevator or exterior the stairs on the East side of the building are available.

Christine Tai,  Construction Project Manager650-378-7350mailto:taic@smccd.edu1/4/20101/11/2010 2:09 PM
Building 9 1st Floor Restrooms Closed - 1/1/10 - 4/30/10Use SHIFT+ENTER to open the menu (new window).
B9 ModernizationCollege of San MateoPedestrian Access1/1/20104/30/2010Building 9 - Library/KCSMJanuary through April, 2010  
Remodel of Men’s and Women’s restrooms on 1st floor

RESTROOM CLOSURE

 

The restrooms on the 1st floor will not be available during construction. Restrooms are available in adjacent buildings.

Christine Tai,  Construction Project Manager650-378-7350mailto:taic@smccd.edu12/25/20091/11/2010 2:13 PM
Contractors Inspecting Buildings 21-29Use SHIFT+ENTER to open the menu (new window).
North GatewayCollege of San MateoInformation Only4/27/20104/27/2010Building 22 - Dental Assisting; Building 21 - Cosmetology; Building 23 - Nursing Lab; Building 24 - Locker Rooms; Building 25 - Machine Tool; Building 26 - Technology; Building 27 - Multimedia, Welding; CPD; Building 28 - Test Cell; Building 29 - NPA/CIS LabsTuesday, April 27, 2010   8:00am – 4:00pm
Re-working of North end of campus, adding a central plaza and parking, enhancing the appeal of the area as a gathering spot and campus destination. Scope of work includes landscaping and concrete beautification with benches, walkways and lighting.
Representatives of RGA Environmental will be on the North end of the campus performing materials sampling in preparation for the North Gateway Project. Every effort will be made to avoid interruption of classes and normal campus activity. The technicians will enter most rooms and visit the roof of Buildings 21 – 29 to carry out their work. They are aware of the educational activities going on and will be respectful of them.  Some materials sampled may be hazardous in nature; the technicians are certified professionals who will employ all appropriate protocols to insure hazardous, or potentially hazardous materials are appropriately handled and contained to prevent exposure to students, faculty, staff and themselves. 
Pepper Powell650-222-5816mailto:powellp@smccd.edu4/20/20104/26/2010 9:04 AM
No Elevator Access in Building 12Use SHIFT+ENTER to open the menu (new window).
Buildings 12/15/17/34 ModernizationCollege of San MateoDisruption4/26/20104/26/2010Building 12 - Physical ScienceWednesday, April 28, 2010 beginning at 6:00 AM
Modernization of restrooms, offices, hallways

CSM BUILDING 12 Demolition and abatement of 1st Floor storefront door

 

There will be no elevator access through this building on this date. Please contact the DSPS department at 650 574-6438 for assistance. Accessible path of travel will resume on the following day.

 

Pedestrian traffic through the 2nd floor will still be available.
Christine Tai,  Construction Project Manager650- 378-7350mailto:aic@smccd.edu4/19/20104/26/2010 9:10 AM
Building 12 Clused During Spring BreakUse SHIFT+ENTER to open the menu (new window).
Buildings 12/15/17/34 ModernizationCollege of San MateoPedestrian Access4/5/20104/9/2010Building 12 - Physical ScienceMonday, April 5, 2010 through Friday, April 9, 2010
Modernization of restrooms, offices, hallways

CSM BUILDING 12 Construction during Spring Break

 

The building will be closed to public access during this week. Various parts of the building will not have power and lighting, due to electrical work. There will be concrete work performed outside the 1st floor East entrance.

Christine Tai,  Construction Project Manager650-378-7350mailto:taic@smccd.edu3/29/20104/5/2010 2:04 PM
No Power on Campus - 4/8/10Use SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoDisruption4/8/20104/8/2010CSM - Entire CampusThursday, April 8, 2010 from 10:00PM to 12:00 MIDNIGHT
Replacement of Main Switchboard Breaker

§  Please turn off your computer and printers at the end of the work day.

 

§  The building will be without light, power to the refrigerator will be off, no one should be in the building during these hours.

 

§  Power will be turned off to the entire District Office for approximately 2 hours.

 

§  There will no remote access to files supported through the server.

 

§  A reminder flier will be distributed on Thursday.

Patty Della Bona, Project Manager650-358-6862mailto:dellabonap@smccd.edu4/1/20104/5/2010 1:59 PM
Building 3 (Theater) Door Replacement - 3/31 - 4/8/10Use SHIFT+ENTER to open the menu (new window).
B2,3 & 4 ModernizationCollege of San MateoPedestrian Access3/31/20104/8/2010Building 3 - TheaterWednesday, March 31st  at 6:00 AM through Thursday, April 8th at 5:00 PM
Roxana Usner, Construction Project Manager650-378-7360mailto:usner@smccd.edu3/24/20103/29/2010 10:11 AM
No Power in Building 5 - 3/26/10Use SHIFT+ENTER to open the menu (new window).
B5NCollege of San MateoDisruption3/26/20103/26/2010Building 5 - Health and WellnessMarch 26, 2010 between 7:00 am and 9:00 am
New 3-story, 89,086 square feet, LEED-certified building for cosmetology, fitness center and health and wellness programs
For testing purposes, Building 5 will experience a planned power outage between the hours of 7 am and 9 am.  Power is expected to be out for approximately 20 minutes.
Roxana Usner, Construction Project Manager650-378-7360mailto:usner@smccd.edu3/19/20103/11/2010 1:17 PM
Plastering work on Entrance Plaza Fountains - 2/25-26/10Use SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoInformation Only2/25/20102/26/2010CSM - Entire CampusThursday and Friday, February 25th and 26th from 6AM to 5PM
Modernization of landscape, roadways and public open space.

Plastering work on Entrance Plaza Fountains will be performed.  Areas around the fountains will be taped off. 

 

Pedestrian access will be maintained at all times, and accessible travel will not be affected.

Roxana Usner, Construction Project Manager650-378-7360mailto:usner@smccd.edu2/18/20102/24/2010 2:02 PM
Flagmen on Aquatics Lane - 2/24-25/2010Use SHIFT+ENTER to open the menu (new window).
Design-Build SiteworkCollege of San MateoTraffic2/24/20102/25/2010Building 8 - GymnasiumThursday, February 24nd  6:00 AM through February 25th  5:00 PM (weather permitting)
Modernization of landscape, roadways and public open space.

The new Swimming pools will be plastered and filled with water.  During this process, Aquatics Lane will be reduced to one lane.  Flagmen will be posted at each end to direct the flow of traffic.

 

Pedestrian access will be maintained at all times and the accessible path of travel will not be affected.

Roxana Usner, Construction Project Manager650-378-7360mailto:usner@smccd.edu2/17/20102/22/2010 9:21 PM
Asphalt re-paving Limiting Access to Building 8 - 2/18/10Use SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoTraffic2/18/20102/18/2010Building 8 - GymnasiumThursday, February 18th from Noon to 7PM
Modernization of landscape, roadways and public open space.

Asphalt re-paving will take place on Aquatics Lane.

 

Today only, Aquatics Lane will not be available for access to Building 8. Redi-wheels will use an alternate route. 

 

There will be heavy vehicle traffic on W. Hillsdale and the perimeter road to deliver materials and equipment to the site.

 

Aquatics Lane will be restored for normal use before Friday, February 19th.
Roxana Usner, Construction Project Manager650-378-7360mailto:usner@smccd.edu2/11/20102/18/2010 10:38 AM
Olympian Lot 11 Closed - 1/18/10 - 2/15/10Use SHIFT+ENTER to open the menu (new window).
Landscape and Erosion ControlCollege of San MateoParking1/18/20102/15/2010CSM - Entire CampusMonday, January 18 through Monday, February 15, 2010
Modernization of landscape, roadways and public open space.

Olympian Lot 11 (formerly Lot 3)

 

The lot will be closed for re-paving which will impact parking and access to Buildings 7, 8 and 9.  Aquatics Lane will remain open during the performance of the work at Lot 11 for Rediwheels to drop off and pick-up passengers at Building 8.

 

Staff parking for Buildings 7 and 8 will be available in Beethoven Lot 2B (formerly Lot 1) or Lot 9F (formerly Lot 14).

 

ADA parking will be available at Lot 3 Davinci (formerly Lot 5) and from there Buildings 8 and 9 can be accessed via the new ADA path of travel.

Roxana Usner,  Construction Project Manager650-378-7360mailto:usnerr@smccd.edu1/11/20101/13/2010 10:22 AM
Area Near Building 5 Roped OffUse SHIFT+ENTER to open the menu (new window).
B5NCollege of San MateoDisruption2/2/20102/8/2010CSM - Entire CampusTuesday, February 2nd  -  Monday, February 8th, 2010
New 3-story, 89,086 square feet, LEED-certified building for cosmetology, fitness center and health and wellness programs

The area adjacent to B5 and a portion of the Main Entrance Plaza will be roped off with caution tape while construction crews working with a boom-lift to install the solar fins on the northwest side of Building 5. 

 

Pedestrian traffic through the area will be maintained at all times.  Accessible path of travel will not be affected.
Roxana Usner, Construction Project Manager650-378-7360mailto:usner@smccd.edu1/26/20102/2/2010 7:54 AM
2/5/10 - Sand Blasting at Main Entrance FountainsUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoNoise2/7/20102/7/2010CSM - Entire CampusSunday, February 7th, from 7am to 4pm
Modernization of landscape, roadways and public open space.

There will be sandblasting work performed at the two fountains located on the main entrance plaza (in front of Building 1 and outside of the Fine Arts Courtyard). The work area will be cordoned-off with caution tape. 

 

Access for pedestrians around the work area shall be maintained at all times.
Roxana Usner, Construction Project Manager650-378-7360mailto:usner@smccd.edu1/31/20102/5/2010 5:03 PM
Contractors in Lobby of Building 3, TheaterUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoInformation Only2/4/20102/5/2010Building 3 - TheaterThursday February 4 - Friday February 5th , 2010, from 6 am to 4 pm
Modernization of landscape, roadways and public open space.

Contractors, NetVersant & Rosendin, will be working in the Building 3 Theater Lobby on ladders pulling cable at various Lobby entrance doors throughout the day.

 

Pedestrian access will be maintained at all times. 

 

Accessible pathways will not be affected.

Roxana Usner, Construction Project Manager650-378-7360mailto:usner@smccd.edu1/28/20102/3/2010 1:38 PM
Sandblasting Near FountainsUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoNoise1/31/20101/31/2010CSM - Entire CampusSunday, January 31st from 7am to 4pm
Modernization of landscape, roadways and public open space.

There will be sandblasting work performed at the two fountains located on the main entrance plaza (in front of Building 1 and outside of the Fine Arts Courtyard). The work area will be cordoned-off with caution tape. 

 

Access for pedestrians around the work area shall be maintained at all times.
Roxana Usner, Construction Project Manager650-378-7360mailto:usner@smccd.edu1/24/20102/2/2010 7:52 AM
Lane Closed on College Heights DriveUse SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoTraffic1/29/20101/29/2010CSM - Entire CampusFriday, January 29th from 9am to 11am
Modernization of landscape, roadways and public open space.

 

Asphalt patching at the entrance to College Heights Drive at Hillsdale Blvd:  One lane at a time will be closed.  Flagman will be posted to keep traffic flowing through the area.
Roxana Usner, Construction Project Manager650-378-7360mailto:usner@smccd.edu1/22/20102/2/2010 7:49 AM
Obstructed Access to Buildings 2 and 4 - 1/4/2010 - 1/15/2010Use SHIFT+ENTER to open the menu (new window).
B2,3 & 4 ModernizationCollege of San MateoPedestrian Access1/4/20101/15/2010Building 2 - Music; Building 4 - ArtJanuary 4, 2010 through January 15, 2010.
ProSpectra Contract Flooring will be setting tile and transition strips in select areas of the exterior walkways.
Entry to rooms may be obstructed for periods of time while work is occurring in the vicinity.   The work will be noisy due to tile cutting, and a bit messy with water for the grout work.
Pepper Powell650-358-6811mailto:powellp@smccd.edu12/28/200912/22/2009 4:20 PM
Restricted Pedestrian Access Near Buildings 16 & 18 - 10/8/2009 - 1/15/2010Use SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoPedestrian Access10/8/20091/15/2010Building 14 - South Hall; Building 15 - Faculty Offices; Building 16 - Central Hall, DSPSOctober 8, 2009 to January 15, 2010
Modernization of landscape, roadways and public open space.
CSM DB Sitework Project Description

Work is scheduled for the north campus spine area between B-16 and B-18.  Construction fencing will be installed around the areas of work.  Access to all buildings and Drip Coffee will remain during this period.

Click here for map

Jack Herbert  Construction Project Manager650- 378-7336mailto:herbertj@smccd.edu10/1/200910/7/2009 1:32 PM
Number of Parking Spaces in Lot 6 Reduced - 12/5/2009 - 1/14/2010Use SHIFT+ENTER to open the menu (new window).
CIP2 DB ProjectCollege of San MateoParking12/5/20091/14/2010CSM - Entire CampusDecember 5, 2009 to January 14, 2010
Modernization of landscape, roadways and public open space.
In order to construct the accessible walkway between Parking Lot 6 (future Lot 4) and the north quad area, four (4) parking spaces in Lot 6 will be dedicated for use by the Contractor beginning December 5 until the start of the spring semester.
 
Jack Herbert  Construction Project Manager650-378-7336mailto:herbertj@smccd.edu11/28/200912/4/2009 4:54 PM
No Water in Building 8 - 1/11/10Use SHIFT+ENTER to open the menu (new window).
B8 Gym ModernizationCollege of San MateoDisruption1/11/20101/11/2010Building 8 - GymnasiumMonday, January 11, 2010
Gym Modernization

Domestic water to the building will be shut off beginning at 3:00 p.m. today and is expected to be turned back on at approximately 8:00 p.m.  Apologies for the short notice and any disruption this may cause.

Diane Martinez650-574-6577mailto:martinezd@smccd.edu1/4/20101/11/2010 2:15 PM
First Floor of Building 12 Closed to Public Access - 12/23/2009 - 1/10/2010Use SHIFT+ENTER to open the menu (new window).
Buildings 12/15/17/34 ModernizationCollege of San MateoDisruption; Pedestrian Access12/23/20091/10/2010Building 12 - Physical ScienceWednesday, December 23, 2009 until Sunday, January 10, 2010
Modernization of restrooms, offices, hallways

DEMOLITION AND ABATEMENT at CSM BUILDING 12, FIRST FLOOR

 

The First Floor of CSM Building 12 will be closed to public access. Elevator and interior stair will also be closed. Staff using Parking Lot 20 (future Edison Lot 7) should use alternate routes. The Bookstore is closed during this period.

Christine Tai,  Construction Project Manager650-378-7350mailto:taic@smccd.edu12/16/200912/22/2009 4:12 PM
1 - 100 Next